Halloween Week will see some street maintenance in downtown Bozeman with street closures on Main, Babcock and Bozeman.

Beginning on Friday, October 26th there will be construction work and street closures related to the sewer line replacement project on South Bozeman Avenue.

Friday, October 26th through Friday, November 2nd

  • South Bozeman Avenue between Babcock and Main Street will be closed in both directions.

Monday, October 29th through Friday, November 2nd

  • Both lanes of eastbound Main Street at the Bozeman Avenue intersection will be closed.
  • Traffic will be reduced to a single lane in both directions along the northern most two lanes of Main Street.
  • Northern lane of Babcock at Bozeman Avenue will be closed.
138052215
John Rodriguez
loading...

 

 

More From 100.7 KXLB